Neuquén · Vaca Muerta · public works
Provincial revenue holds it up; tolls have not startedthesis

Public road works and toll road concessions

Estimated entry range for a supplier
~USD 10-30M/year in 2-3 years
Estimated market: ~USD 198 M - 233 M/yr already invoicing estim
up to date · reviewed Oct 7, 2026
estim 2026urgent demandour reading
At a glance
Who buys
The provincial DPV, directly
the 4 doors →
When
The detailed designs for RP 8 and RP 51, on the 158 km being prefinanced, have already been tendered, and the Province expects «to start works before the end of the year». The works bidding documents are the window to arrive qualified thesis. verif Oct 1, 2026 ↗
what to watch and where it stands →
The main barrier
The qualification certificate from the provincial register of builders: without it the bid is automatically rejected verif Decreto 108/1972, and the annual capacity graded by the register limits the size of work. thesis
the whole entry map →
Where you get in
Do not fight for the toll concession —which has not started anyway— nor for the large works already awarded. Enter where there is a dated pipeline and the bottleneck is capacity:
the 4 routes →

While the national government cuts public works, Neuquén funds them with Vaca Muerta revenue: the roads line of the 2026 budget is one third of the provincial infrastructure plan, ~USD 198-233 M a year estim, although what is actually contracted out is less because Vialidad Provincial does a good part of it with its own plant and staff. ⭐ And there is a new date: on 8 September 2026 thirteen operators agreed to prefinance up to USD 154.5 M of works on 158 km of RP8, RP51 and RP7 prob Vialidad Provincial and Legislature, and the designs and the tender belong to the Province. ⛔ The toll concession, by contrast, is not about to happen: its clock only starts once an agreement with Vialidad Nacional is approved, and today that agreement is not even signed.

State road works already invoicing with the provincial budget, and 158 km prefinanced by the operators with the detailed designs already tendered; tolls still have no agreement

verif primary sourceestim our own calculationthesis our readingHow to read all five →

What the market is made of

The market is activity, not a capturable opportunity. Part of the line never goes to tender —what the highways agency executes with its own plant and staff— and another part is already awarded. What is addressable is the recurring flow of mid-sized works, the inputs and subcontracted maintenance.

How it splits, and against which total
Breakdown of the 2026 line (midpoint ~USD 215M): not contractable ~18% (in-house production and equipment of the provincial highways agency) · large works already awarded and tolling systems ~37% · addressable ~45%. Tolls and the operators' prefinancing fall outside this breakdown. Our own estimate. estim
Not contractableUSD 39 M · 18%
CaptiveUSD 80 M · 37%
AddressableUSD 96 M · 45%
Not contractableUSD 39 M18%non-addressable
in-house production and equipment of the provincial highways agency: never goes to tender
CaptiveUSD 80 M37%non-addressable
large works already awarded and tolling and weighing systems, from global vendors
AddressableUSD 96 M45%addressable
mid-sized road works, inputs (aggregates, asphalt, signage, barriers) and subcontracted maintenance
Non-addressable

The toll concession —when it exists— would be taken by two to four large groups with capital and a track record, and the tolling and weighing systems belong to a handful of global vendors. On top of that is what never goes to tender: almost USD 39M of the line is in-house production and equipment of the provincial highways agency. Not addressable. estim

Addressable share

The recurring flow of mid-sized road tenders —repaving, sections, bridges—, the inputs (aggregates, asphalt, signage, barriers) and subcontracted maintenance. Against what is contractable to third parties: ~USD 90-140M/yr for a regional contractor or supplier. estim

Entry range for a supplier

An input supplier or a mid-sized road contractor can take ~USD 10-30 M a year within two or three years, riding the paving plan and the 158 km of the operators' agreement. The barrier is the qualification certificate from the register of builders and the annual contracting capacity, plus equipment or plant capital. estim

▸ Leverage, not a guarantee — the bottleneck is the qualification certificate from the provincial register of builders and the annual contracting capacity attached to it, not demand.

Who really pays?

The obvious name pays at only one of the doors. In the September agreement with the operators, the oil companies prefinance and the Province produces the designs and runs the tender. Four different doors:

If you sellProvincial road works (repaving, sections, bridges)
→
The provincial DPV, directly verif Jul 1, 2025 ↗

Vialidad Provincial tenders the works: for example, the repaving of 54 km of RP 6, with an official budget of ARS 11,682 M (Licitación Pública 35/25) verif.

If you sellInputs (aggregates, asphalt, signage, guardrails)
→
Vialidad Provincial (DPV) itself, through stockpiling tenders; and the contractor that won the works thesis verif ↗

Do not assume a single door: Vialidad Provincial buys asphalt, culvert pipes and metal guardrails on its own account (tenders 129, 130 and 131/25, more than ARS 2,017 M); the contractor that wins the works also buys them thesis.

If you sellThe Vaca Muerta corridor works the operators prefinance
→
The Province, which produces the designs and runs the tender — the operators only put the money up front prob Sep 9, 2026 ↗

According to Vialidad Provincial, the 8 September agreement with thirteen operators prefinances up to USD 154.5 M, extendable by 15%, on provincial routes 8, 51 and 7 —158 km according to the Legislature—, recoverable against royalties with a 20% cap. The official note says «all Vaca Muerta roads are paid for by the Province» and that «the Province will prepare the detailed designs needed for the subsequent tender of the works». The text of the agreement is not published. ⇒ the door is Vialidad Provincial, not an oil company's procurement department thesis.

If you sellTolls and concession maintenance
→
Nobody yet: there is no concessionaire and no bidding documents verif in force since 2026 ↗

The national decree delegated the power to grant toll concessions to nine provinces, but it first requires an agreement with Vialidad Nacional approved by the Secretaría de Transporte, and only from that approval does the one-year deadline to call a tender run. The agreement transferring roads that Neuquén signed on 16 September 2026 says tolls «will require signing a new specific agreement with the national government» verif.

▸
The point that decides where to knock: the works under the September agreement are prefinanced by the oil companies, but the designs and the tender belong to the Province, so the door is Vialidad Provincial and not an operator's procurement department. And tolls, as yet, are paid by nobody.

When the window opens

The earliest warning is not the tender: it is the works plan that anticipates it.

What to watchWhat changes when it happensStatus
The provincial budget's public works plan, line by line
It is the itemized list of which roads are worked on and with how much, published months before the first bidding documents. It is the earliest warning of all: the tender comes out of the plan, and the plan is published first.
ARS 351,027,482,808 for 2026 —the sum of the plan's six roads and highways items—, 34.8% of the provincial infrastructure plan verif Dec 23, 2025 ↗
The law ratifying the road agreement, and then the bidding documents for the 158 km
Private contributions go into a special account and the Province is the one tendering, and it has to produce the executive designs first. The agreement is already signed, but the money moves once the Legislature ratifies it: that is the milestone that opens the work, and the bidding documents come after.
the Legislature gave general approval to the law ratifying the agreement on 7 October 2026, with 22 votes verif Oct 7, 2026 ↗
The execution order of the four stages, which the agreement sets in advance
The four are not tendered together: the agreement puts them in order. (1) Paving of RP 8 from the junction with RP 6, the stretch known as «Camino de la Tortuga». (2) RP 51 between its junctions with routes 8 and 17. (3) Resurfacing of RP 8 between routes 51 and 7. (4) RP 7 from the Río Negro border to the junction with route 8. ⭐ For a supplier that is the schedule: the work starts at the Camino de la Tortuga, and whoever wants to be in the first one has to be qualified before that tender is published, not before the last.
order of the four stages according to press coverage of the bill ratifying the agreement of 8-Sep-2026 prob press.
See the evidence
the detailed designs for the first two (RP 8 and RP 51) were tendered and their bids opened on 21-Sep, and that day the governor said that «on route 8 work has already started up to the Camino de la Tortuga» verif Government of Neuquén; the sources do not clarify whether he meant the first stage of this agreement or an earlier work. The Legislature approved the bill in general on 7-Oct-2026 with 22 votes verif Government of Neuquén. ⚠️ The text of the bill is not published
prob Oct 7, 2026 ↗
The repayment of the contributions against royalties, which only begins in month 30
The operators pay up front and recover later: each can offset up to 20 % per month of the royalties and/or the extraordinary production levy it owes, and the remaining 80 % keeps going to the Province. Repayment only begins in month 30, counted from when each contribution is made. ⇒ the works do not wait for the royalty flow, so the pace is set by the tender and not by the treasury; and the Province gives up no revenue for two and a half years.
initial contribution USD 154.5 M, extendable to USD 177,675,000 (USD 177.7 M); deposited into a special account of the Corporate Social Responsibility Trust administered by Fiduciaria Neuquina S.A.
See the evidence
⚠️ The official notes describe the 20% cap as applying to the Province's total royalties, not per company, and a legislator placed the start of the recovery in month 31
prob Sep 15, 2026 ↗
The provincial highways agency's tender listing
The call is the earliest event in the purchasing chain: it is published before the opening and long before the first invoice for aggregates or asphalt.
published by event, with irregular timing verif Sep 14, 2026 ↗
The works plan for the 165.84 km of national routes the Province took over
Neuquén took on full management —works, upkeep and maintenance— of three national stretches: RN 242 (58.84 km, Las Lajas to the Pino Hachado pass), RN 231 (32 km, up to the Cardenal Samoré pass) and RN 40 (75 km, from the RN 237 junction to the RN 231 one). The Province decides the plan and puts up the financing, and may carry it out in-house or through third parties. ⭐ For a supplier that is new demand that used to be tendered by the national government and is now tendered by the provincial highway agency — the same buyer as always, with 165.84 km more on top. ⚠️ The roadway remains under national jurisdiction: what changes is who manages and pays, not who owns the road.
agreement signed on 16 Sep 2026 with the national highway agency; the Works and Investment Plan has not been published yet, and the executive designs drawn up by the provincial highway agency are subject to technical validation by the national one verif Sep 16, 2026 ↗
The toll agreement, which is a separate one and does not exist yet
The handover has been signed, but it did not bring the toll with it. The 16 Sep agreement says the Province may promote a toll concession, and that implementing it requires signing a new specific agreement with the national government. ⇒ without that second act there is no concession tender and no clock running: the toll leg is still worth zero, even though it moved up a step.
the handover of the 165.84 km was signed on 16 Sep 2026; the specific toll agreement has not been signed as of 18 Sep verif Sep 16, 2026 ↗
The monthly correction factor of the provincial public works council
It is what decides whether a works contract keeps its margin: the rules require publishing it every month, at up to 80% of the construction cost index, and cost variations are settled on it. If it lags, the contractor loses money even as the work advances.
the obligation to publish it is monthly; we could not read the current value, the body's site did not respond unconf Sep 14, 2026
The amount for each section, given by the minister in the Legislature
It sizes each contract before the tender documents: one of about USD 90M, contested by the large contractors, and three of USD 6M to 50M, within reach of a mid-sized firm. And since every section carries a toll and dynamic weigh-in-motion control, the scales are a separate purchase.
RP 8, 95 km section: USD 91.3 M; RP 8, 8 km section: USD 6.8 M; RP 51 (40 km): USD 50.4 M.
See the evidence
RP 7 (15 km): USD 6 M. They add up to USD 154.5 M. «The estimate is to start works before the end of the year». These are reference amounts stated by the minister, not awarded contract values
verif Oct 1, 2026 ↗
What signals the game has changed
Provincial fiscal adjustment

The road line-item is ~1/3 of public works, tied to the surplus and to Vaca Muerta rents. A drop in royalties (crude price) cuts the road item, easy to prune. thesis

Tolls do not start, and today the clock is not even running

Decreto 253/2026 gives one year to call a tender, but that period only starts once the Secretaría de Transporte approves the agreement with Vialidad Nacional verif text of the decree.

See the evidence
The agreement transferring national roads that Neuquén signed on 16 September 2026 did not enable tolls: it says implementing them «will require signing a new specific agreement with the national government» verif Government of Neuquén. ⇒ no bidding documents are possible in the near term, and this whole leg is worth zero today. thesis
Social/political resistance to tolls

Tolls on urban stretches (the access to the capital) and on Vaca Muerta traffic make freight more expensive: that is where we expect resistance from users and trucking chambers once the tariff is set.

See the evidence
As of the Aug-2026 cutoff we have no formal act of rejection on record —neither from governors nor from chambers— against this scheme: it is what we are watching, not a done deal. It shrinks tariff or coverage. thesis
External financing is already inside the budget, not on top of it

The road works in the north of the province —Las Ovejas–Varvarco, Manzano Amargo, the Pichachén pass— are inside the 2026 roads line, under the provincial unit for externally financed projects verif 2026 public works plan.

See the evidence
⇒ they do not enlarge the market: they explain where the money for part of what is already counted comes from. If execution slips, what slips is a portion of the line, not a new block. thesis
See the remaining risk
A signatory questioned over Malvinas

In committee, objections were raised to Wintershall signing: its assets were bought in 2024 by Harbour Energy, which merged in 2021 with Premier Oil, the company sanctioned for operating in the Malvinas.

See the evidence
According to the Legislature's note, the minister said the matter is under study and that if a company drops out, another has to take its place, because the model requires the companies to put up 100% of the financing verif Legislature. If a signatory leaves, its contribution is split among the rest and ratification may be delayed. thesis

The opportunity in depth

How to get inthe gap and the routes that open it
1

⭐ The 158 km the operators prefinance on RP8, RP51 and RP7: thirteen operators according to Vialidad Provincial and the Legislature —the list of signatories of the bill has fifteen corporate entities— contribute USD 154.5 M under the agreement of 8 September 2026, which was signed for USD 177.6 M with 15% more for contingencies prob. The Province produces the detailed designs and runs the tender. The minister gave the amount for each section: USD 91.3 M for the long section of RP 8 (95 km), 6.8 M for the short one (8 km), 50.4 M for RP 51 (40 km) and 6 M for RP 7 (15 km) verif. The first stage is RP 8 from its junction with RP 6, at the «Camino de la Tortuga», followed by RP 51, RP 8 between 51 and 7, and RP 7 prob. The detailed designs for RP 8 (85 km estimated) and RP 51 (56 km estimated) have already been tendered, with bids opened on 21-Sep-2026 verif; those lengths do not match those of the agreement's sections and the sources do not explain the difference. The Legislature gave general approval to the law ratifying the agreement on 7 October 2026 verif and the Province expects to start works before year-end: those are the months to get qualified thesis.

2

Aggregates, asphalt and concrete with job-by-job service along the corridor. ⚠️ We cannot claim a plant is missing nearby: we did not identify a public register of asphalt plants in the province.

3

Signage, road safety and barriers, which the large contractor subcontracts and which the budget itself itemizes separately.

4

Road engineering and works supervision for the municipalities joining the provincial plan, and for the detailed designs the Province has to produce before tendering the 158 km.

What you needcapital, certification, tax regime and who pays
State works are paid against progress. What it takes to enter — the full map, open:
Capital
Installed capacity: asphalt plant, quarry or road equipment. It is capacity investment, not commercial. ⚠️ Ley 3502 sets no investment floor for fiscal stability verif: the USD 500,000 quoted here and there verif is the bottom of the band that defines the simplified procedure, not the door into the regime.
Qualification
⭐ This is the real barrier thesis. The provincial public works law creates a register of builders and suppliers that grades «technical, economic, financial and execution capacity», and its implementing regulation requires the bid envelope to contain the qualification certificate from that register: its absence is «grounds for automatic rejection of the submission» verif.
See the detail
The same regulation recognizes the certificates of the national register «on Annual Contracting Capacity», which is the cap on the size of work one can aim for thesis. ⚠️ The processing time, the cost and the financial statements required are not published: the website of the body that issues the certificate does not respond.
Regime
The provincial reactivation law enabled, until 26-Apr-2026, the renegotiation of stalled contracts. The monthly correction factor published by the provincial public works council —of up to a 80% share of the construction cost index— is what decides whether a contract keeps that margin. And by siting a plant you capitalize Ley 3502.
Who pays
It depends on what you sell: the provincial highways agency on tendered works, the main contractor on inputs, and the operators only prefinance — the Province is still the one contracting.
▸ You tell us where to see what your company does and we tell you whether we see a sign that it fits this opportunity, with the evidence behind it. See if my company fits this opportunity →
When you get paid, and what blocks it
The state road works block pays today: the Province tenders and pays from its current budget, and the reactivation law opened, for two years, the renegotiation of stalled contracts, until 26-Apr-2026 barring an extension that was not found. The first invoice arrives at the pace of tenders, with works lasting eight to eighteen months. Bottleneck: the qualification certificate from the provincial register of builders, which goes inside the bid envelope —its absence is «grounds for automatic rejection of the submission» under the regulations of the public works law— plus equipment or plant capital. Tolls pay tomorrow and nobody knows when: until the Secretaría de Transporte approves the agreement with Vialidad Nacional, not even the deadline to call a tender is running. estim
Who you compete againstwho is already there and what share they take
Who is
already in
Market
split
Regional road builders (Patagonia / Comahue) via DPV tenderRotating long tail; none dominant thesis

They rotate by tender (repaving, sections, bridges). Five companies bid in the tender for the detailed design of RP 8 verif.

Local contractor, sole qualified bidder for toll/weighing controlsVisible in road control infrastructure

It was the only bidder admitted in the tender for the toll and dynamic weighing checkpoints on RP 7 and 17 (it bid ~ARS 3,986 M against an official budget of ARS 1,945 M) prob, but the Government announced it would declare the tender void because of the cost of the bid and that it was weighing a direct award prob.

Toll collection and dynamic weighing system vendorsConcentrated: in the RP 7 and 17 tender only one bid was admitted prob

The other two bids were rejected for lacking the electrical engineering registration in the provincial register of builders prob. Technology, references and registration are the barrier to entry thesis.

Toll concessionaires (national road-corridor groups)No concession awarded in Neuquén

Granting a concession on a national section first requires the agreement with Vialidad Nacional that Decreto 253/2026 calls for, and that delegation, within which the concession sits, cannot run longer than 30 years from its approval verif. That agreement is not signed. We expect two to four large groups with capital and a track record to take it thesis.

See the remaining player
Local aggregates / asphalt / concrete suppliersAtomized input

Physical bottleneck (asphalt plants, quarries, laying logistics) rather than commercial competition. It is the capacity limit of the 600 km program thesis.

The jobs it createsDirect construction employment, labor-intensive (local UOCRA.

the detail on jobs and trades
earthworks, concrete, asphalt, signage); according to press coverage of the budget, the 600 km program would equal «half of everything paved in the province throughout its history». Trainable trades: road equipment operators, soil lab technicians, surveyors, bridge welders. Local linkages: aggregate and asphalt plants, road equipment workshops, works transport (regional SMEs). For the people: paved roads to the towns of northern Neuquén (Paso Pichachén) and decongestion of access to the capital; on the flip side, tolls raise the cost of getting around for residents and hauliers. thesis

How we
calculate it

The number is our own estimate. The calculation, step by step, is below.

The full calculation, step by step
Annualization window: NONE — Neuquén has no window, and that is the statement. This TAM does not spread a capex over years: it measures the annual flow of a population and an activity that are already installed in the corridor, not a project that ends. All Neuquén niches are measured with this same unit, so their TAM/year figures do compare with one another. ⚠️ What is NOT comparable: a Neuquén TAM/year against one from Catamarca, San Juan or Salta. Both are written «USD X M/year» and measure different objects — here it is a recurring flow; there, a construction capex spread over a window that closes. One block in the headline and two outside it, and all three are counted separately. Block A, the recurring floor and the only one in the headline. The «roads and highways» line of the 2026 provincial budget = ARS 351,027,482,808 (the sum of the six «roads and highways» items of the public works plan; the plan does not print the total) ÷ ~1,508.50 pesos per dollar = USD 232.7 M/yr; at 85% execution, USD 197.8 M. ⭐ Of that line, ARS 58,904 M is in-house production and equipment of Vialidad Provincial itself and only ARS 1,486 M goes out to contract, so what is contractable to third parties is ~ARS 293,609 M ≈ USD 195 M/yr. That is the figure a contractor needs. Block B, tolls: worth zero today and with no date. Decreto 253/2026 delegated toll concessions to nine provinces, but the one-year deadline to call a tender only starts once the Secretaría de Transporte approves the agreement with Vialidad Nacional, and that agreement is not signed. The gross toll revenue once estimated —on the order of USD 25-55 M/yr— is the concessionaire's income, not the satellite supplier's, and is never added. Block C, the operators' prefinancing: a dated pipeline, outside the headline. The 8 September 2026 agreement puts up to USD 154.5 M —extendable by 15%— on 158 km of RP8, RP51 and RP7, with the Province in charge of the designs and the tender. It is multi-year stock on works that are not in the 2026 plan, so it is not added: it is declared. ⚠️ And the Alto Neuquén external loan is not a separate block: its works are itemized and budgeted inside the 2026 line, under the external financing unit. It is the funding source for part of block A, not an additional block. Per-kilometre reference: repaving 54 km of RP6 was tendered with an official budget of ARS 11,682 M, i.e. ARS 216 M per kilometre; at the mid-2025 exchange rate that is about USD 177,000 per kilometre estim. ⛔ It is not comparable to new mountain paving in Alto Neuquén, which is an order of magnitude more expensive: they are different works.

Concentration Mixed by sub-block. Road civil works are fragmented and rotate by tender, with no stable winner. Toll and weighing systems are concentrated among a few vendors. The toll concession has no award at all in the province and would be taken by a few large groups. Window open in mid-sized works and in inputs; closed in the concession and in the systems. thesis

The rule that moves it

Two rules from different jurisdictions and at different stages. The provincial one was already in force: the public works reactivation law opened, for two years, the renegotiation of stalled contracts, until 26-Apr-2026 barring an extension that was not found. The national one does not yet: Decreto 253/2026 delegated to nine provinces —Neuquén among them— the power to concession stretches of national routes by toll, but it first requires an agreement with the national highways agency approved by the Secretaría de Transporte, and only from that approval does the deadline to call a tender start running.

enables
Neuquén reactivates public works: it renegotiates stalled contracts and excludes lost profit
See the rule →
Ley 3432 opened the renegotiation of stalled public works contracts, with a two-year reactivation plan from its publication (until 26-Apr-2026, barring an extension that was not found).
enables
Neuquén will be able to award its national routes to private players as toll concessions
See the rule →
Decreto 253/2026 is national and delegates to nine provinces —Neuquén among them— the power to concession stretches of national routes by toll.
See the full legal grounds
⛔ But it first requires an agreement with the national highways agency approved by the Secretaría de Transporte, and only from that approval does the year to call a tender run: as of 10 September 2026 that agreement was not signed.
enables
The oil companies pay for Vaca Muerta's roads: USD 51M with no public money
See the rule →
The oil companies fund corridor roads and recover against royalties. ⚠️ the September 2026 agreement makes clear they prefinance but do not tender — «all Vaca Muerta roads are paid for by the Province», which also prepares the executive designs for the subsequent tender.

Where the number comes from

~USD 233M/yr for the full line, ~198M at 85% execution — and ~195M of what is actually contractable to third parties

See the calculation, the variables and how it was validated

The recurring floor is built from two live variables: the roads line of the provincial budget and the exchange rate. Tolls are not a formula — they have not started.

ARS 351,027M (roads and highways, 2026) ÷ ~1,508.5 ARS/USD=~USD 233M/yr for the full line; ~195M contractable to third parties
Roads and highways lineARS 351,027M/yrannual review
34.8% of the provincial infrastructure plan, set in the Budget and revised once a year. Tied to Vaca Muerta revenue.
Exchange rate~1,508.5 ARS/USDlive data
It converts the peso budget into dollars and is what moves the figure most without any political decision changing: it went from 1,480 to 1,508.5 and the ceiling dropped seven million.
What never goes to tender~ARS 57,400 Mannual review
In-house production and equipment of Vialidad Provincial itself, of which only ARS 1,486 M goes out to contract. It is the difference between the budget line and the market.

Tolls are not a formula and are worth zero today: the national decree gives one year to call a tender, but that period only starts once the Secretaría de Transporte approves the agreement with Vialidad Nacional, and that agreement is not signed. And the operators' prefinancing —up to USD 154.5 M on 158 km— is multi-year stock on works not in the 2026 plan: it is declared separately, not added.

The number rests on a few variables. The formula shows how it moves when each one changes; and each variable carries its freshness seal — how often it is worth revisiting. estim

How solid the number is estim

The floor of the figure now comes from the Public Works Plan of the 2026 Budget, not from a press note: the six roads and highways items add up to ARS 351,027,482,808, 34.8% of the infrastructure plan, and at the September 2026 reference exchange rate they give ~USD 233 M, or ~USD 198 M at 85% execution. ⭐ The plan also brings the breakdown, and that is where the useful figure is: some USD 39 M is in-house production and equipment of Vialidad Provincial itself, so what is contractable to third parties is on the order of USD 195 M. And two warnings, both read in the rule itself. Tolls are not about to be tendered: the one-year clock only starts once the Secretaría de Transporte approves an agreement that is not signed. And the external loan is not additive: its works are already itemized inside the 2026 line. ⛔ And a third, the one most easily copied wrong: the governor speaks of a «USD 1,000 M-a-year road plan» unconf, and that figure does not correspond to any single instrument — look for it and it breaks up into five separate commitments, with different funding sources and different timeframes, some of which are already counted in the budget line. It is not published as a plan, and that is why the figure on this page comes from the budget and not from the announcement.

Coverage: the registry of Proveedores Neuquinos Certificados under Ley 3338, counted in full: 1,045 companies, 295 of them in the «ingeniería y construcción de facilities» category · Oct 14, 2026 · not reviewed: that category is a coarse, self-declared label that does not tell an asphalt plant from a construction company; the provincial register of builders does not publish a list of names; and we did not identify a public register of asphalt mixing plants in Neuquén, so nothing here states that one is missing

How to cite this figure: Despegue (2026). Public road works and toll road concessions · Neuquén. despegueargentina.com/en/neuquen/obra-vial-concesiones-peaje · terms of use

Neighbouring markets5 markets in the same group, from USD 0,5 to USD 1,050 M a year

First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
Page 1 of the example executive summaryOpen the report ↗A real analysis · a real company, open in full →
Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The TAM is an estimate with a transparent method, not an official figure; the framing is labeled as thesis. Every figure carries its source. ← All opportunities in Neuquén