Despegue ← Neuquén OPPORTUNITY
22 more opportunitiesOther opportunities ▾
ESEN Where my company can get in
Neuquén · Vaca Muerta · satellite service
RIGI multiplies the physical base requiredthesis

Industrial and logistics real estate

Estimated entry range for a supplier
~USD 8-20M/yr
Estimated market: ~USD 90M - 170M/yr estim
up to date · reviewed Oct 14, 2026
estim 2026urgent demandour reading
At a glance
Who buys
The OFS or mid-sized SME that chooses not to buy
the 3 doors →
In which projects
Pampa Energía, Pluspetrol, Tecpetrol and 1 more · and 1 more not yet approved
what each one invests →
When
It is closed by the regime, not by the well: whoever wants the ten years of fiscal stability on a warehouse has to join Ley 3502 before January 2028, and not when the tenant appears. And the supply already listed grows faster than construction does. thesis
what to watch and where it stands →
The main barrier
Cheap State land cannot be leased: the title carries a prohibition on sale, lease or assignment for ten years verif Decreto 97/2026. To lease out, you have to buy private land, and there the capital stops being small. thesis
the whole entry map →
Where you get in
Do not add one more cheap unserviced lot —the slow State and the open market already do that—. The gap is closing the quality and location shortfall, knowing which side you are entering from:
the 3 routes →

Every operator and every service company entering Vaca Muerta needs a physical base close to the operation: a yard for pipe, sand and equipment, a workshop warehouse, offices. Serviced land is still scarce and public supply moves slowly —the Province already tendered a logistics centre in 2020 and the official portal still announces the Plataforma Logística of sector Z1 as «upcoming call for investors»—. But the market is no longer empty: the first private park inside Añelo opened in March 2026 with 103 lots and more than 200,000 m² of warehouses planned. And there is one clause that decides the business before it starts: land granted by the State cannot be leased for ten years.

verif primary sourceestim our own calculationthesis our readingHow to read all five →

Who really pays?

The obvious name is not the customer. The base is paid for neither by the operator nor by the EPC: each service company assembles it on its own — and the business changes depending on whether it buys or rents. Three different doors:

If you sellRental of class A warehouse / serviced yard
→
The OFS or mid-sized SME that chooses not to buy unconf Sep 14, 2026

Service companies and supply-chain SMEs without a base of their own, through a direct B2B lease with the developer. Asking prices published today in Añelo run from USD 5,000 for 250 m² to USD 25,000 for 3,086 m² covered, brand new and fully serviced. That is the wedge: the addressable market is precisely the one that does not tie up capital in bricks.

If you sellSale of serviced industrial lot
→
The large OFS that does buy, or the SME that takes title prob Jan 1, 2025 ↗

The boutique private park in San Patricio del Chañar asked, in its 2024 pre-sale, USD 113 per m² for its interior lots and USD 150 for road frontage, before launch discounts prob, and the private park in Añelo went on sale at an initial price of USD 115 per m² prob. That the large buyer prefers to buy and keep ownership rather than rent is our reading thesis.

If you sellBuild-to-suit + leaseback (custom-built warehouse)
→
The OFS that prefers not to tie up capital estim Mar 16, 2026

The opposite of buying: the developer builds the base to measure and the service company leases it on a long anchor contract. The product already exists —the Añelo park offers turnkey warehouses—; what is not yet widespread is the leaseback. ⛔ And it is built on private land: State land cannot be leased for ten years.

▸
The mid-sized company rents; the big one buys and keeps the freehold; the one that will not tie up capital is offered build-to-suit plus leaseback. Each service company decides its own base, not the operator.

Which projects move this demand

USD 4,500 M Apr 9, 2026 ↗

The RIGI's first oil upstream project. Adhesion on 25-Jun-2026 (Acta 23 of the Comité Evaluador) and approval by Resolución 1025/2026…

see the project →
USD 6,400 M Aug 19, 2026 ↗

Development of ~70,000 bbl/d, ~380 wells, 35-year concession. 10% carry for GyP. The works include a Central Processing Facility (CPF)…

see the project →
USD 12,240 M Oct 19, 2026 ↗

Development of the asset Pluspetrol bought from ExxonMobil. Peak of 100,000 bbl/d + 12 MMm3/d, +600 wells. Includes GyP's 10% carry.

see the project →
USD 3,000 M Mar 11, 2026 ↗

The largest natural gas liquids project in Argentina's history: a fractionation plant for 2.7 million tonnes a year of propane…

see the project →
USD 25,000 M May 15, 2026 ↗

YPF mega-development: plateau of 240,000 bbl/d in 2032, 1,152 wells. A signal of the scale jump in Neuquén upstream leveraged on already-secured…

see the project →

When the window opens

The physical base precedes the operation, so the figure that warns is not the well — and the one that changes a decision most runs against scarcity. There is also a paperwork clock: Ley 3502 came into force with its implementing decree, Decreto 97/2026 of 22 January 2026, and it gives two years to join, extendable once by up to one more year. Whoever wants the ten years of fiscal stability on a warehouse has to get in before January 2028, not when the tenant appears. On the other side, the warehouses listed for rent in Añelo went from 14 in July to 38 on 14 September 2026.

What to watchWhat changes when it happensStatus
Warehouses listed for rent in Añelo
It measures the available supply, which is what a new warehouse competes against. If it keeps rising, scarcity closes before the building is ready and the proximity premium shrinks.
38 listings as of 14 September 2026, against 14 in July; asking prices run from USD 5,000 to 25,000 a month unconf Sep 14, 2026
The call for investors for the Plataforma Logística of sector Z1
In 2020 the Province put out to concession tender 39 hectares for a logistics centre at the intersection of the Autovía Norte with the new alignment of Route 67 prob press. While the platform remains uncalled, serviced logistics land is supplied privately; the day it goes to tender, a competitor the size of an entire park enters at once.
Not called: the official portal still says «Upcoming call for investors» verif Oct 14, 2026 ↗
The list of companies admitted under Ley 3502
Every admission is a company settling in that will need square metres. The rule itself requires publishing the list: the Ministerio de Economía must «set up a web page or tab listing the beneficiary companies, investment made, locality and benefits granted».
The obligation is written into the rule; as of 14 September 2026 we did not find the page published unconf Sep 14, 2026
The register of certified Neuquén suppliers
Every new certification is a company getting itself in shape to contract in the province, and the certification scores having a base and offices in Neuquén: it pushes towards taking square metres.
1,040 companies as of 14 October 2026 verif Oct 14, 2026 ↗
Basin projects filing under the RIGI
The physical base is sought before drilling, so the project's filing signals warehouse demand long before it shows up in the park.
Pampa Energía approved (Boletín Oficial of 21 July 2026) and Tecpetrol approved (Boletín Oficial of 9 October 2026).
See the evidence
Pluspetrol approved (Boletín Oficial of 19 October 2026); YPF LLL and TGS filed, not approved
prob Oct 9, 2026 ↗
What signals the game has changed
Scarcity closes on its own, and faster than the building does

The whole thesis rests on serviced product being scarce. The published supply of warehouses for rent in Añelo went from 14 in July 2026 to 38 on 14 September: it almost tripled in two months.

See the evidence
A warehouse takes from months to two years to be ready, so whoever starts today competes against supply growing faster than their own construction. ⚠️ Listed is not occupied, but it is the only countable number there is. unconf
Public land speeds up

If the public parks complete services and open up cheap land, they pressure private class A rent. thesis

Slowdown in the pace of wells

Absorption depends on the pace of activity; a brake (crude price) cuts demand for warehouses/yards. thesis

Public land is released all at once

In 2020 the Province put out to concession tender 39 hectares for a logistics centre at the intersection of the Autovía Norte with the new alignment of Route 67 prob press, and today the official portal announces the Plataforma Logística of sector Z1 as «Upcoming call for investors» verif 14-Oct-2026.

See the evidence
While it stays that way, serviced logistics land is supplied privately; the day it goes to tender, a public competitor the size of an entire park enters. thesis

The opportunity in depth

How to get inthe gap and the routes that open it
1

Class A warehouses for rent and build-to-suit inside Añelo (not 40 minutes away in Neuquén or Centenario): this captures the premium of being close to the operation, which today is paid in travel hours and double meal allowances. thesis

2

Yards with services —power, weighbridge, 24-hour security, paved apron— for pipe, sand and equipment: the fixed property still being improvised on bare ground. thesis

3

Build-to-suit plus leaseback for service companies that prefer not to tie up capital in bricks: a purpose-built warehouse and a long B2B anchor contract. ⛔ On private land: land granted by the State under Ley 3502 cannot be leased for ten years verif.

What you needcapital, certification, tax regime and who pays
The land is paid for, and so is the tenant. What you need to enter — the full map, open:
Capital
Real-estate capital plus serviced land; the development cycle runs from months to two years. The build-to-suit plus leaseback model solves service companies' preference for not tying up capital. ⚠️ Ley 3502 sets no investment floor at all verif: the USD 500,000 quoted here and there is not the door into the regime but the bottom of a band reaching USD 1,000,000 verif that defines the simplified adhesion procedure for small projects.
Land and permitting
The bottleneck is not a technical standard: it is getting serviced land —power, water, gas, fibre, paved road— plus the industrial permit for the site and municipal zoning. ⛔ And the decision made before signing: land granted by the State under Ley 3502 carries an absolute prohibition on sale, lease or assignment for ten years, with automatic reversion and no compensation.
Workforce
An excluding requirement of the regime that almost nobody names: Ley 3502 demands hiring 70% local labour, with effective residence evidenced by the address on the national identity document. The implementing decree clarifies that this 70% is calculated only over the new workers the project brings in, and is evidenced through the employer register of Ley 3468.
Regime
Ley 3502: turnover tax and stamp duty exemption and ten years of fiscal stability, with no investment threshold. Ley 378: public land is sold at a promotional price, which today is no longer «the fiscal value» but a band between the assessed (fiscal) value and market value, set case by case with reports from the Tribunal de Tasaciones and from Catastro. Plus the provincial accession to the RIGI for the anchor projects.
Who pays
It is neither the operator nor the main contractor: each service company arranges its own base, and the business changes with who that is — the big ones buy their property and the mid-sized ones rent.
▸ You tell us where to see what your company does and we tell you whether we see a sign that it fits this opportunity, with the evidence behind it. See if my company fits this opportunity →
When you get paid, and what blocks it
It pays: serviced supply is scarce and the price proves it. The build-to-suit plus leaseback model solves service companies' preference for not tying up capital. Bottleneck: real-estate capital and serviced land, with a development cycle of months to two years — and the decision not to use State land if the business is renting. estim
Who you compete againstwho is already there and what share they take
Who is
already in
Market
split
Provincial/municipal public parks (PIN Neuquén, Añelo, Plaza Huincul, Centenario)Own the land stock, but almost all of it is reserve without services

The official portal of the Subsecretaría de Industria says, verbatim, that Añelo «intends to develop 700 ha of reserved land» and that Plaza Huincul is «a 395 ha reserve»: these are not square metres on offer today. The only provincial park with declared companies is the one in the city of Neuquén — over 900 hectares and «more than 300 companies», of which more than 30 in sector Z1. verif

Private industrial district outside AñeloThe only private park the State lists on its portal

114 hectares and 263 lots on Autovía 51, and a 25-hectare Tenaris operating base unconf. Land is said to have gone from around USD 60/m² in 2022 to 80-120/m² later unconf. It is the only private park listed on the province's official portal verif.

Private industrial park inside AñeloThe only private park inside Añelo, already opened

34 hectares and 103 deedable lots from 1,350 to 27,000 m², on Route 17 km 5 prob. It went on sale at an initial price of USD 115/m², with turnkey warehouses of up to 5,000 m² prob.

See the evidence
It opened on 16 March 2026 with more than 200,000 m² of warehouses planned for some 100 companies prob. In October 2026 it finished the works and began handing over possession of the lots to the companies that had committed to set up there prob. ⚠️ We did not find published how many lots are sold or how many warehouses are built unconf.
Private boutique park in San Patricio del ChañarNew entrant

38 ha and 68 lots —13 commercial and 55 for services— in San Patricio del Chañar. In its 2024 pre-sale it asked USD 113/m² for interior lots and USD 150/m² for lots fronting the road, before launch discounts, with at least half a dozen interested parties prob.

See the remaining player
Standalone warehouses on the open marketAtomized long tail, and it is the cheap end

A press article reports that some companies pay between USD 10,000 and 15,000 to rent a warehouse «in areas that often have no services» prob. In the Añelo listings, 450 m² on a 5,000 m² plot with a 75 kW three-phase supply and an office asks USD 10,000 plus VAT, the cheapest sit between USD 5,000 and 6,500 and class A above, at USD 25,000 unconf. These are asking prices from a property portal, not closing prices.

The jobs it createsOrders Añelo's urban-industrial growth (today warehouses in areas without services), construction and park-operation employment, and decongests the operation. thesis

Non-addressable

The land stock is concentrated in public parks, and almost all of it is reserve without services: Añelo «intends to develop» 700 reserved hectares and Plaza Huincul is «a 395-hectare reserve». Add to that the service companies that already bought their property —Tenaris, Halliburton and SLB are cited unconf—: rent nobody collects. Not addressable. estim

Addressable share

Addressable: class A warehouses for rent and build-to-suit inside Añelo, and yards with services —power, weighbridge, 24-hour security— for pipe, sand and equipment. In the private serviced segment we identified a first entrant and not yet a second. estim

Entry range for a supplier

A developer arriving with finished product and an anchor contract takes a share of the rent to third parties and of land absorption: on the order of USD 8-20M a year in a market of 90-170M. ⚠️ We did not find published the yield being asked today: what can be looked at are the asking rents —USD 5,000 to 25,000 per month depending on floor area and services— against the opening price of USD 115 per m² in Añelo's private park. thesis

▸ Leverage, not a guarantee: the regime helps whoever settles in to produce, not whoever develops to lease — and published supply almost tripled between July and September 2026.
How we
calculate it

The number is our own estimate. The calculation, step by step, is below.

The full calculation, step by step
Annualization window: NONE — Neuquén has no window, and that is the statement. This TAM does not spread a capex over years: it measures the annual flow of a population and an activity that are already installed in the corridor, not a project that ends. All Neuquén niches are measured with this same unit, so their TAM/year figures are comparable with one another. ⚠️ What is NOT comparable: a Neuquén TAM/year against one from Catamarca, San Juan or Salta. Both are written «USD X M/year» and measure different objects — here it is a recurring flow; there, a construction capex spread over a window that closes. Two blocks, and the assumption that links them is left in plain sight because we did not find it published. (1) Rent of warehouses and yards leased to third parties. ~550-750 units × ~USD 9,500/month × 12 = ~USD 63-85M/yr. ⚠️ The price comes from the 38 warehouse listings for rent in Añelo as of 14-Sep-2026, which run from USD 5,000 (250 m²) to USD 25,000 (3,086 m² covered on a 10,940 m² plot, brand new, with water, gas, power, fibre, manoeuvring yard and generator) unconf: these are asking prices, not closing prices. The quantity has no such backing: it is our own assumption, there is no occupancy census in the corridor, and it counts only what is leased to a third party — the properties bought by the service companies —Tenaris, Halliburton and SLB are cited unconf— are excluded because nobody collects that rent. (2) Annual absorption of industrial land. ~0.3-0.7M m²/yr × ~USD 90-120/m² = ~USD 27-84M/yr. The unit price is the asking price: USD 115/m² as the opening sale price of Añelo's private park prob and USD 113-150/m² in the 2024 pre-sale in San Patricio del Chañar, before launch discounts prob . (1)+(2) = ~USD 90-170M/yr. Build-to-suit stays out: it is upside, not base.

Concentration Low-medium, and no longer empty. The land stock is held by public parks that are mostly reserves without services, so the serviced product is supplied privately. Inside Añelo we identified a single private park standing —opened in March 2026, with a masterplan of more than 200,000 m² of warehouses— and outside Añelo the official portal lists just one, three times larger unconf. ⇒ this is not an ownerless market: it is a market with a first entrant, and we did not identify a second. How much of that masterplan is taken cannot be known from the outside: we did not identify a public list of allocated or available lots.

The rule that moves it

No reform creates this market: activity lights it, and every megaproject entering the RIGI drags a wave of physical bases behind it. What the provincial regime decides is how you get in, and not in the way it looks: Ley 3502 exempts turnover tax and stamp duty and guarantees ten years of fiscal stability —with no investment floor at all in its text—, but its implementing decree prohibits selling, leasing or assigning for ten years the land the State grants under the regime. And the «fiscal price» of Ley 378 is no longer a price: today it is the floor of a band that reaches market value.

See the underlying reading

The underlying policy that opens up this demand. It is the same inference declared by the rules and the program pillars pushing in this direction.

better export netback + without controls, supply responds to the boom
enables
Neuquén joins the RIGI: Vaca Muerta enters the 30-year regime
See the rule →
The basin's megaprojects that are entering or applying to enter RIGI —Pampa and Tecpetrol approved; Pluspetrol with its entry approved by the Comité Evaluador.
See the full legal grounds
YPF LLL and TGS filed— set off a wave of service companies that need a physical base near Añelo: it is the engine that creates demand for land, warehouses and yards.
touches
Industrial promotion: land at fiscal price and exemptions by agreement
See the rule →
Ley 378 allows selling public land at a promotional price when it is indispensable for settling the industry, by agreement and case by case.
See the full legal grounds
⚠️ Today that price is no longer «the fiscal value»: Ley 3502 supersedes Ley 378 and requires setting it within a band between the assessed (fiscal) value and market value.
enables
Invest in Neuquén: the 'Neuquén RIGI' asks for no investment floor
See the rule →
It exempts turnover tax and stamp duty and guarantees ten years of fiscal stability, with no investment floor in the text of the law.
See the full legal grounds
⛔ But its implementing decree prohibits selling, leasing or assigning for ten years the land the State grants under the regime: whoever develops to lease cannot use it.

Neighbouring markets5 markets in the same group, from USD 0,5 to USD 1,050 M a year

How we validate this figure

How solid the number is estim

The figure leaves out the rent imputed to properties the big companies bought and do not lease: nobody collects that value, and that is why the market is measured at USD 90-170M a year and not double that. The price does have backing of its own: the 38 warehouses listed for rent in Añelo as of 14 September 2026 ask between USD 5,000 and 25,000 a month, counted one by one in the portal's header, and Añelo's private park went on sale at an opening price of USD 115 per m². ⚠️ The number of leased warehouses, by contrast, is an assumption and is written as such: there is no occupancy census in the corridor and the official parks portal publishes hectares and nothing else. ⚠️ And the annual yield usually quoted for this asset class is not published for Añelo, so none appears here: what can be looked at is the asking rent against the price of serviced land.

Coverage: the industrial parks published by the Subsecretaría de Industria, opened in full —four provincial ones, the Free Trade Zone, the municipal ones and a single private park listed by the State—, the 38 warehouse-to-let listings in Añelo and the registry of Certified Neuquén Suppliers, with 1,029 companies · Sep 14, 2026 · not reviewed: no provincial or municipal park publishes which plots are allocated and which are free —the official portal publishes hectares and nothing else— and there is no census of space take-up along the corridor: how much of the private masterplan is taken cannot be known from outside

How to cite this figure: Despegue (2026). Industrial and logistics real estate · Neuquén. despegueargentina.com/en/neuquen/suelo-industrial-naves-yards-vaca-muerta · terms of use

First step · free
The first read of your company

We look at what your company does and tell you whether we see a sign that it fits this market, with the evidence behind it. If we do not see one, we say so too and name the condition that would change it. One page as a dated PDF, within 48 working hours.

Not here for a company? Invest · Work (in Spanish) · Start a business (in Spanish) · Institutions
Page 1 of the example executive summaryOpen the report ↗A real analysis · a real company, open in full →
Ignacio Aredez
Analysis and curation: Ignacio Aredez
Head of Despegue
Method and track record →
  • 20+ years in technology, 15 of them in data and AI, for clients across Europe and the Americas
  • Certified in AI governance (ISO/IEC 42001)
  • Machine Learning (Google Cloud)
  • Registered expert with the European Commission
How to read the seals →
  verif primary source · prob primary source pending · unconf a source said it · estim our own calculation · thesis our reading · the date belongs to the datum, at the precision its source allows
This is not financial advice. The TAM is an estimate with a transparent method, not an official figure; the framing is labeled as thesis. Every figure carries its source. ← All opportunities in Neuquén